    The process of getting a new electricity connection in Pakistan has become much simpler with the introduction of the digital Electricity New Connection (ENC) system in 2026. In the past, applicants often had to visit multiple offices and wait months for approval, but the new online system has transformed the procedure into a faster and more transparent service. Whether you are constructing a new house or need a separate electricity meter for a different portion of a building, the ENC portal allows you to apply online with minimal paperwork.

    The government has also introduced a fast-track installation option for domestic consumers, meaning that if your documents and site survey are approved, the meter installation can be completed within a few weeks. By following the official ENC process, applicants can avoid unofficial agents and secure a legal electricity connection without unnecessary delays.

    Service DetailOfficial Information 2026
    Application PortalNew Electricity Meter Connection (ENC)
    Processing Time15 to 30 Working Days
    Standard FeePKR 7,000 – 8,000 (Single Phase)
    New FeatureAMI Smart Meter Support
    Official WebsiteOfficial ENC Portal

    What is the New 2026 Electricity Connection Policy?

    In 2026, the Ministry of Energy introduced a centralized digital system that integrates all electricity distribution companies, including LESCO, MEPCO, PESCO, and FESCO. This unified platform aims to reduce corruption, improve efficiency, and ensure that all applications are processed fairly. The new system also allows applicants in certain areas to purchase approved AMI smart meters themselves if government inventory is unavailable.

    Another important feature is the use of GIS mapping technology to confirm whether the property is located within a safe distance from the nearest transformer or power line. This automated verification helps determine the technical feasibility of the connection before payment is required.

    Who is Eligible for a New Electricity Meter?

    Anyone who legally owns or occupies a property can apply for a new electricity connection. The property may be a residential house, a plot with construction, or a commercial shop. The applicant must provide proof of identity and property ownership.

    Tenants are also allowed to apply if they submit a valid No Objection Certificate from the property owner. Additionally, the address must not have any unpaid electricity bills or a history of permanent disconnection due to non-payment, as the digital system automatically checks such records before approving the application.

    Identity Proof: The applicant must have a valid CNIC.
    Ownership Evidence: Property registry, allotment letter, or sale deed is required.
    Infrastructure Proximity: The property must be within reach of an existing electricity line.
    No Dues Certificate: The address must not have outstanding electricity bills.
    Witness Verification: A copy of the CNIC of a neighbor who already has an active connection is usually required.

    How to Apply Online for New Meter Step-by-Step?

    The New Electricity Meter application process begins on the official ENC portal where applicants select their relevant distribution company based on their city or region. After choosing the appropriate category, such as domestic or commercial, the applicant fills in personal details and the complete address of the property.

    The portal also requires the reference number from a nearby electricity bill to help the technical team identify the nearest transformer and feeder line. Once the online form is completed, the applicant uploads scanned copies of the required documents. A tracking ID is generated after submission, which must be saved because it is needed to print the application form and track the application status later.

    Application StepAction to be Taken
    Online EntryFill the application form on the ENC website
    Document UploadAttach scanned CNIC and property documents
    Physical FilingSubmit printed form to the local SDO office
    Demand NoticePay the issued fee at bank or mobile payment service
    Wiring InspectionAllow inspection of internal house wiring

    What Documents are Required for a 2026 Application?

    Although the document requirements have been simplified in 2026, applicants must ensure that all documents are clear and properly attested to avoid rejection. The most important document is an attested copy of the applicant’s CNIC. Proof of property ownership such as a registry document or transfer letter must also be submitted. In addition, a copy of a neighbor’s electricity bill is required so the distribution company can identify the correct feeder and pole. If the property is rented or jointly owned, the applicant must provide an affidavit or NOC from the owner confirming permission to install a new electricity meter.

    How to Pay Demand Notice and Track Status?

    Once the application is verified and the technical team completes the site survey, the distribution company issues a demand notice through the ENC portal or via SMS. For a single-phase domestic meter, the fee is usually around PKR 7,000 to 8,000. This amount can be paid at designated banks or through mobile payment services such as EasyPaisa or JazzCash. After the payment is confirmed in the system, the status changes to “Payment Verified,” and the electricity company schedules the meter installation. Applicants can monitor every stage of the process online by entering their tracking ID on the ENC portal.

    Conclusion

    The How to apply for new electricity meter Pakistan 2026 guide shows how digital services have simplified the process of obtaining a new power connection. The centralized ENC system allows applicants to complete most steps online, reducing the need for repeated office visits. By submitting accurate documents, completing the online registration correctly, and paying the demand notice promptly, applicants can significantly speed up the installation process. With the introduction of AMI smart meters and faster verification systems, getting a new electricity meter in Pakistan has become more efficient and transparent than ever before.

    Frequently Asked Questions (FAQs)

    1. How much does a new single-phase electricity meter cost in 2026?
      The demand notice fee for a single-phase domestic meter is usually between PKR 7,000 and 8,000, depending on the distribution company.
    2. Can I purchase my own electricity meter?
      In some areas, distribution companies allow consumers to purchase approved AMI smart meters from authorized vendors if government stock is unavailable.
    3. How can I track the status of my application?
      You can track the progress of your application by entering your tracking ID on the official ENC portal.
    4. Do I need to visit the SDO office after applying online?
      Yes, after completing the online application, you usually need to submit the printed form and physical documents to the local SDO office for verification and site inspection.

    Leave a Reply